On behalf of Aannemerssbedrijf K. Dekker we are designing, manufacturing and supplying the hydraulic system for the new traffic-, bicycle-/ pedestrianbridge over the canal by Aalsmeer.
The province of Noord-Holland is the client for the realization of this new bridge. The bridge is wider and has five lanes instead of the current three. Besides that a cycle path has been created on the bridge. The underpass has also been widened, so the new bridge has a larger shipping capacity. The new bridge has a minimum vertical clearance of the fixed part of 1.80 meters. The clearance height of the movable part is 1.28 meters, the clearance width is approximately 5.5 meters. The bridge opened in 2013.