Bongerd bridge Amsterdam

The Bongerdbridge becomes a bicycle / pedestrian bridge across the Zijkanaal I and forms the connection with the center area of ​​Amsterdam-Noord.

Commissioned by Hillebrand B.V. Molenmaker Techniek B.V. supplies the complete hydraulic installation consisting of; an electric motor of 45 kW with an electronic regulated closed system pump with a capacity of 180 liters / minute, stainless steel oil reservoir with a capacity of 450 liters and equipped with a depth filtration system, emergency pump set with an electric motor of 3 kW and a pump capacity of 9 liters / minute, 2 hydraulic cylinders 220 / 160×1968 with an absolute road measuring system and position switches.

The bridge will be delivered by fall of 2018.